11-story steel structure with provision for two future stories; roof-top helipad; 2-story underground cast-in-place concrete parking garage; 3-story space frame atrium; and alterations to two existing building.
Major structural alterations and renovations to a five-story historic stone and steel structure. Extensive use of underpinning required for the addition of a sub-basement. Infill floor framing added to create additional floor level in existing stack area. Attic expanded to create larger mechanical room.
Anticipated Completion: 1998
Estimated Construction Cost: $40,000,000
(Principal in charge, while with DiBlasi Aschettino P.C.)